Project
Sticker Manufacturing Facility
Client
  •  Don Hostetter
  •  12 Weeks
PROJECT SYNOPSIS
BUILT. retrofitted Sticker Giant’s PEMB with open-concept offices, a call center with fiber-optic internet capabilities, a control room, two full restrooms with showers, and a break room. The remodel required specialized equipment hook-ups and a new fire-sprinkler system. The production area was customized with upgraded electrical service, HVAC, and glycol system for state-of-the-art printing equipment.
/